A few photos from group 1 did not get posted yesterday so they are pasted here:
Tuesday, June 18, 2013
A rainy, but fun Tuesday!
On Tuesday, the group woke up to a rainy day that nobody
expected. Then as Sean told the group that we were not going to our work sites due
to flooding here in Hazard, Sean gave us a game plan for the day and then we
drove 1.5 hours to see Man of Steel(Superman). Afterwards, we drove back to the
church and a few people did care cards while some people went to the pavilion
to play or cool off in the shower. Later, we ate a delicious meal cooked by the
kitchen crew. Then as the group settled down Sean gathered everyone for bible
study. Lastly, as the day ended and everything came together Sean gave us a guide
for Wednesday and we all went to bed.
The group did a great job being flexible and open to the surprise weather, and ended up getting to know each other even better. Everyone is even more excited to get back to work tomorrow!
Jack White and Mark Dager contributed to this blog posting.
Monday, June 17, 2013
First Work Day
Team 1: We are assigned to build
a 3 bedroom 2 bathroom house upon a pre-existing cinderblock foundation. We were all able to experience a variety of
power tools and carpentry skills in creating the supports of the floor of the
home. By the end of the day, we had all
the floor supports finished, and had about half of the plywood floor in
place. We used well over a thousand
pounds of wood and about 45 pounds of nails to get this far. We enjoyed a lovely devotion after our lunch
break lead by Victoria, and loved getting the time to talk to and bond with the
carpenters helping us on our project.
-Victoria Kuhn, Jane Drumheller,
Haley White, Fiona Asbury, Mark Dager, Nathan VanBrunt, Ed Tennant, Squire
Galbreath, and Sarah Miller
Team 2: We were assigned to
clear vegetation covering an entire wall of an apartment building and build a
decorative wall with cinder blocks in place of the vegetation. The morning was
very successful; we cleared all of the vegetation and roots and built the wall
efficiently. Unfortunately, we were told that we had to move the cut-up brush
back to where it was and take down the wall (it was put in the wrong place).
Although we were frustrated, we knew that this project wasn’t about us, so we
had to be flexible and obey our carpenter.
-Amanda Kuhn, McCartney
VanBrunt, Grace Pereles, Meredith Srour, John Galbreath, Maddie McGill, Sean
Miller, and Pam Drumheller
Team 3: Our assignment is to
take out the existing porch on the house and replace it with a brand new wooden
deck. Before arriving, we had no idea
that the porch we are taking out would be cement. We started with taking out the wooden
banister that surrounded the porch.
That was pretty easy, most of the boards were coming apart so that part
was not hard to demolish. The hard part
came next. We had to take 8- and 10-pound
sledge hammers and start whacking the cement, and only little pieces would come
off at a time. We worked hard all day
and made a dent in the porch, but we desperately need the reinforcement of jack
hammers, that hopefully our carpenters will bring tomorrow. Despite the frustration of slow progress, it
was really satisfying after many hits with the sledge hammer, a piece of cement
would finally come off.
-Emily Petti, Lia Sohl, Carolyn
McGill, Stefanie Baarman, Jack White, Lynda Tennant, Noah Pereles, and Kendra
Grams
Sunday, June 16, 2013
More thoughts on our travels...and the highlights of our first full day in Southeast Kentucky
The car ride up to Kentucky was very interesting. Every van
had a different experience. Some silent and sleepy, some loud with everyone
singing, some with games, some with awkward small-talk, and then the one that
Kendra yelled at Ed for speeding the whole
time. Even though each van was different, each was enjoyable. Kendra decided
she wanted to lead the whole time so she would constantly speed to stay in
front. About six hours in we stopped at a Wendy’s to eat dinner. All the cars
met up again and enjoyed some good laughs over our delicious fast food. About three hours later all five vans arrived
in Hazard Kentucky. We tried to navigate our way to the church, but one wrong
turn led us all the wrong way. Pam, with her GPS, led most of the vans right back to the church. However, Kendra’s van
rode in circles trying to find the church, for at least fifteen minutes. Once everyone
arrived at the church, we got settled in. Kendra then announced she was going
to be nice and let everyone sleep until eight thirty-the highlight of our day.
On Sunday, we took part in our host church’s (First
Presbyterian) worship service. We then departed to a beautiful log cabin church
in which we were taught the history and were able to explore.
After the log church, we went to Walmart and
worked together gathering all of our groceries for the week (4 enormous carts full) as well as some
personal shopping for snacks in our rooms.
On the road...
Our group pulled out of the PPC parking lot just after noon yesterday. For all but a short stretch on I-66 west, we had open road and smooth sailing. We enjoyed the incredibly scenic drive southwest on I-81. As we pulled off the interstate to head northwest into Kentucky, we stopped at Wendy's for dinner (picture above)...where the bird toy/ puzzle in someone's kids meal was enjoyed by several in the group (picture above). We pulled into Hazard just after 9pm as we had hoped and settled in for the night.
Today, we will worship with our host congregation, First Presbyterian Church of Hazard, Kentucky, before heading out to explore the area a bit and do our massive grocery shopping run.
Sending our love and prayers back to all our families and the PPC family and giving a "shout out" to all the dads and wonderful men in the world on this Father's Day.
Saturday, June 15, 2013
Arrived...safe and sound
Just wanted to let everyone know that we are all here safely. There may or may not have been lots of going around the block to "find" the church where we are staying, but all arrived safely. We are preparing for lights out in a few moments and will give a more full report of our travel and arrival tomorrow.
Thursday, June 13, 2013
Log Cabin Cathedral...
From http://www.hazardperrytourism.com/attractions.html:
Buckhorn Lake Area Presbyterian Church Log Cathedral 606-398-7382, 300 Buckhorn Lane, Buckhorn, KY 41721 Built in 1928, this majestic Cathedral was constructed of white oak from the surrounding mountains. It is one of only three remaining buildings of the Witherspoon College campus and is listed on the National Register of Historic Places. The Cathedral features a Hook & Hasting pipe organ as well.
Buckhorn Lake Area Presbyterian Church Log Cathedral 606-398-7382, 300 Buckhorn Lane, Buckhorn, KY 41721 Built in 1928, this majestic Cathedral was constructed of white oak from the surrounding mountains. It is one of only three remaining buildings of the Witherspoon College campus and is listed on the National Register of Historic Places. The Cathedral features a Hook & Hasting pipe organ as well.
Subscribe to:
Posts (Atom)



